INGESOM configures a SCADA application for the control of drying tunnels in an international timber company.

INGESOM performs modifications in a SCADA program for an international lumber company with problems in the drying tunnels, and to solve them, all communications with the different existing PLC’s were reviewed to verify their proper functioning.
The SCADA application has several screens that allow the configuration, monitoring and introduction of the different load curves for each of the dryers. In addition, it is possible to define the load curves by setting the temperature for each zone of the dryers.

  • Newsletter

Subscribe to our monthly Newsletter on Linkedin